Electrical and plumbing work for shops and restaurants: three-phase power, ventilation and licensing
Focus Preview
- Three-phase powered:It is important to obtain the approval of the building management office and/or the executive board, and to confirm that the power distribution system will not be overloaded.
- Electrical engineering:The work must be carried out by a certified air contractor and the completion certificate signed after completion (form WR1).
- ♪ To eat the air ♪Installation of mechanical ventilation systems at a minimum of 17 cubic metres per hour per person in space; There is a separate ventilation system for the rooms, kitchens and toilets.
- Oil reservoir:The current situation in the country is one of great concern for the environment, which has to have a sufficient number of reservoirs, and sewage discharges are subject to the EPA water pollution control license plate.
- Time:The power increase involves multiple consent and approval, which should be evaluated before the lease is signed.
Restaurants, shops and offices line Castle Peak Road and Kau Yuk Road and occupy shopping centres across Yuen Long. Commercial work, especially in restaurants, requires three-phase supply upgrades, ventilation, fire safety and licensing to be considered together.
Adequate electrical capacity and compliant ventilation can determine whether a restaurant obtains its licence and opens on time. Sze Kit Electrical and Plumbing Services, a registered electrical contractor in Yuen Long, explains the electrical work and outlines the official ventilation, drainage and licensing requirements. Consult the latest guidance from the Food and Environmental Hygiene Department, Fire Services Department and Environmental Protection Department for full details.
I'd like to know the range of our services.Our services The use of the Internet; Query and offer are available.Contact us。
I. BETWEEN BUSINESS AND HOUSING WATER AND EQUIPMENT
| Item | Housing | Business/food |
|---|---|---|
| Electricity | Relative fixation | Cookers, coolers, snowboxes, brand-named lights are running at the same time. |
| Electricity supply | It's based on single-photo electricity. | High power equipment requires three-phase power. |
| License | Not involved | You have to meet the requirements of license plates for ventilation, fire protection, and hysteria. |
| Ventilation | General requirements | The venom system is regulated by law. |
| Term | It's more bulletproof. | We have to match the opening date and set aside time for the trial. |
ii. Why does the venom require three-phase electricity?
Apart from cooking electric power, lighting, air conditioning, snowboxes in the shop and light-box signs up to the door will all require a stable and adequate electrical capacity. When there is not enough power available to commercials to meet demand, it is necessary to request additional capacity from electric companies, commonly known as "uppower" or "up to three-phase electricity".
- High power equipment:Commercial electromagnetic furnaces, ovens, dishwashers etc. use much more electricity than domestic appliances.
- Load balance:Three-phase power can be distributed evenly to the three-phased power loads, which are more stable.
- Avoid overload:It has a capacity to avoid the use of breakers during busy hours (also written as "breakers jumps"), which has an impact on business.
- Equipment requirements:Some commercial devices must use three-phase power in their design.
III. EQUIPMENT AND DIVERSITY ASSESSMENT
The most important step before applying for power is to accurately calculate the amount of power used by the commercial. Inadequate estimates and may be reapplied later; Overestimation increases unnecessary costs.
Calculating the pace of power use
- All electrical equipment, including cooking appliances, air conditioning, snow cabinets, signboards and lighting.
- This is a record of the amount of power or current per device.
- This is the first time that the government's policy has been implemented.
- Leave room for additional equipment after the due date.
- The current power supply capacity is assessed as sufficient by certified electric contractors.
Signs of inadequate power supply
- During busy hours, breakers often jump, especially when cooking equipment and air conditioning are open.
- The power pressure is unstable, the equipment works irregularly.
- Heating of wires, power switches or plugs.
The Department of Electrical and Electric Engineering suggested that, prior to the installation or replacement of electrical devices, the owner should engage a certified electric contractor to conduct a feasibility study and consider the amount of electricity needed after the day in order to determine whether it would be necessary to request an increase in power supply from the power company. The cause of the breaker jump is available.Why breakers trip。
IV. Conditions and processes for powering three-phase electricity
Application
- Agreement:A certified electric contractor or engineer must obtain the consent of the building management office and/or the executive committee before any new or additional electrical devices can be transferred to the power distribution system.
- The building system cannot be overloaded:It is important to make sure that the denial does not overload the existing distribution system in the building. The larger building, the power supply may be limited.
- The owners agreed:Before making such changes, the tenant should obtain written consent from the owner.
General process
- A certified electric contractor was hired to assess the demand for the load and the current power supply.
- Query and obtain consent from the building management office and/or the board of owners.
- An application is submitted to the power company, which provides information on estimated electricity demand and electrical equipment circuits.
- The price of the money was paid at the request of the power company.
- Installation or refitting of electrical devices.
- The certified electric contractor inspected and tested the electrical equipment and signed a certificate of completion (Form WR1).
- The electricity company inspected and rejected the power supply.
Yuen Long is the electricity supply range of China. The actual application, the required documents and the fees are based on the latest requirements of the electric company. The time required is dependent on the remaining capacity of the power supply system, whether it needs to be reset and how far it will go with the agreement of the parties, and recommends that this start as early as possible.
- Any power work, including the installation, re-engineering, inspection, testing and maintenance of electrical devices, must be carried out by a certified electric contractor.
- Upon completion of the inspection and test, the certified electrician contractor and the certified electrician must sign a certificate of completion (Form WR1).
- If a commercial and office power device is allowed to carry more than 100 amperes, it must be inspected and tested at least every five years and obtain a periodic test certificate (Form WR2).
V. REQUESTS FOR EFFORTS AND EXCHANGE
Ventilation is one of the core requirements for draconian plates. The following are the main provisions of the Food and Environment Agency ' s Code of Conduct for Living in Food and the Guide to Applying for Licences:
| Item | Request |
|---|---|
| Is natural ventilation enough? | If the outdoor vents or windows open between seats are less than one tenth of the floor, i.e. natural ventilation is inadequate. |
| Machine ventilation. | When natural ventilation is inadequate, the installation of an mechanical ventilation system to ensure that each person receives at least 17 cubic metres of indoor space gas per hour within the range of people expected to be acceptable. |
| Independent ventilation system | There must be an independent ventilation system in the room, in the kitchen or in the food room and in the bathroom. |
| Kitchen. | You need to have a blow-out and a pump. You need to have enough gas. |
| Smoker. | All stoves must have metal smokers on top and be properly connected to the pump fan. |
| Waste emissions | The gas should be properly filtered and then lined up outside, but without causing any disturbance. |
| The law is based on | Installation of a ventilating system in accordance with the Regulations on the Application of Ventilation Facilities in Schedules (Chapter 132, attached to the Act) |
Ventilation and power.
As gas fans, fresh winders and smokers all require a stable power supply, the design of the ventilation system must be combined with the power schedule, including sufficient back-to-back and appropriate power position.
VI. ELEMENTS AND DRUGS
- Oil reservoir:The Environment Agency's Guide to Application for Driving Licences provides that well-stored oil tanks must be set up to separate the grease from sewage in order to prevent it from going into drains or sewers.
- Drained:Food-intensive sewage discharges are regulated by the Water Pollution Control Ordinance. People interested in running a catering business apply for and obtain a water pollution control license issued by the Environmental Protection Agency, which is usually valid for five years.
- Emission location:Erosive sewage must be discharged into the sewers and not into the canals.
- Maintenance:The reservoirs should be properly installed and regularly cleaned in order to be able to effectively separate the grease.
Kitchen traffic is mostly related to grease accumulation, cause and treatment.Drain clearance guide。
VII. License matching and division of labour
Before starting their business, the food industry must obtain a license issued by the Food and Environment Agency. The license project involves a number of departments and specialized disciplines, understanding who is responsible for the various components, helping to organize and time them.
| Templates | The department. | Responsible professionals. |
|---|---|---|
| Power, power, power. | Electric and Mechanical Services Department, Electric Company | Licensed air contractor |
| Ventilation system | Food Environment Department, Fire Department. | Registered special contractors (e.g., ventilator engineering) |
| Fire-fighting devices | Fire Department | Registered fire-fighting equipment contractor |
| Gas stoves and pipes | Electrical and Mechanical Services Department | Registered Gas Project Carrier |
| Water and plumbing works | Water Department | Carded Pipeman |
| Sewage discharge | Environmental Protection Agency | Operators apply for water pollution license plates. |
Sze Kit Electrical and Plumbing, a certified electric engineering contractor and small engineering contractor, is responsible for the electrical component of licence plate works, including load assessment, distribution and rerouting, plugs and lights, billboard power, as well as checking and testing of electrical devices. The rest must be done by the professionals listed above, and we can cooperate in power supply. How to qualify as a contractor can be consulted.How to select a registered electrical contractor。
VIII. Water and electricity needs of different types of business
| Commercial Type | Water and power. |
|---|---|
| Food, restaurants. | The demand for electricity is highest, with three more phases; You have to meet the ventilation, the oil tank and the fire. |
| Retails, fashion stores | Photo by Flickr user @salms_sa.com. We need enough and right-positioned outlets to match the shelf and the presentation. |
| The beauty salon, the hairhouse. | There's a lot of power, and there's plenty of room, hot water supply and drainage. |
| Office. | Photo by Flickr user @Leaves, used with permission. The point is, the number of plugs and back-routing. |
| Clinic | Some of the equipment is more demanding for power stability, so it's time to set up a dedicated circuit. |
It's a common need for all types of business, and the questions are available.10 major reasons why the air conditioners is not cold enough.and Cleanup of air conditioners Period。
IX. CONSTRUCTION PROJECTS FOR COMPUTER EQUIPMENT PROJECT
- On site:The government has been able to evaluate existing power, water and ventilation conditions, as well as the need for commercial services.
- Planning:Power programs are developed and are coordinated with ventilation, fire protection and drainage design.
- The petition is for:Apply to the electricity company for increased capacity and to the relevant departments for licences and ventilation approvals.
- Construction:The projects were carried out as planned.
- Check and test:Check and test the electrical device after completion, and sign a certificate of completion (Form WR1).
- Receiving power:The electricity company inspected and denied the power supply.
Ten or five common mistakes.
1. Underestimation of power demand
The busiest hours, when people start to open without a load count, often cut off their way and apply for additional power again, affecting both the business and the cost.
2. Failure to obtain consent to the building
The application was blocked without the consent of the Administration and/or the Chamber of Industry.
3. Ventilation not achieved
The ventilation system does not meet the requirements of the Environment Agency and affects the application for a licence.
4. Employment of non-registered maintenance technicians
Electricity works must be carried out by a certified electric contractor and a certificate of completion must be signed, otherwise there is no guarantee or it may affect the power denial.
5. Inadequate time planning
The time required for power and approval was underestimated, and the rents started but did not start as scheduled.
The business tenant must know
- Before the contract was signed, it was assessed:Prior to the signing of the lease, arrangements were made for a certified electric contractor to assess whether the power supply capacity in the booth was sufficient and whether the power increase would be feasible.
- The owners agreed:The power increase is a major change, and the owner’s written consent should be obtained first.
- Revert the original clause:The government has been paying attention to the repairs and repayment of the original terms of the lease.
- Earnings free:The contract may be signed at the time of the request for additional power and licence plates.
- Save file:Works documents such as certificates of completion are properly preserved.
- We're going to have to comply with the building regulations:This includes construction time and requirements to protect public places.
The responsibility for the maintenance of the rental property is available.Who pays for repairs in a rented home?。
XII. Daily maintenance of commercial water and electricity
- Electricity:Periodic checks of distribution panels and leaks of circuit breakers; Watch if the plugs and power switches are hot or loose. In the case of frequent breakers, the cause should be identified at an early stage.
- Ventilation:The government has been monitoring the use of the gas and smoke-smoking process to regularly clean up the oil that is accumulated in the air and to ensure that both the air-smoking fan and the wind machine are operating properly. The government has been working on a project to improve the quality of the air-conditioning system.
- Oil reservoir:Periodic inspection and cleaning.
- For drainage and cooling:Periodically check whether the taps and drainage are leaking or plugged; air conditioners is regularly cleaned.
Businesses often lose more than maintenance costs when they are shut down due to water and electricity failure. Sze Kit Electrical and Plumbing provides 24-hour emergency power maintenance, which can be accessed through emergency response methods.24-hour emergency repairs in the northwestern New Territories and Overnight emergency repairs in Yuen Long。
XIII. Fees
The cost of commercial water and electricity projects varies widely, depending on the amount of power added, the current state of supply in buildings, whether it needs to be re-fitted to raise the general line, the size of the top floor and the number of equipment, etc., and is not priced equally. We'll make the price only after the evaluation, and all works will have to be paid before they start.
Reference fees for residential and general maintenance projects, available Yuen Long repair prices for 2026 The use of the Internet; What you should be looking at when asking for a price is available.Repair quotation pitfalls。
XIV. Common problems
Do you have to have a three-phase power?
Not necessarily, depending on the power demand for the equipment. Food-cooked boilers, coolers, snowboxes and branded lamps operate at the same time, with large power use, and some commercial equipment requires three-phase electricity for design. If there is not enough electricity to handle it, an additional supply capacity will need to be requested from the electric company.
Who needs permission to apply for power?
Prior to the rejection of new or increased electrical devices to the building distribution system, the certified electric contractor or engineer must obtain the consent of the building management office and/or the executive board, and ensure that the denial does not overload the existing power distribution system in the building. The tenant should also obtain the written consent of the owner.
How much time does it take for the third phase to go on?
The time required depends on the surplus of the power supply system in the building, whether it needs to reset up the main line or add to the power company's equipment, and the time required to obtain the consent of all parties, and not a single time. It is recommended that certified electric contractors be evaluated before the lease is signed and that sufficient time be set aside.
What's the demand for a draughty ventilation?
According to the Food for Life Code of the Food Environment Agency, if there is insufficient natural ventilation in the seating room, i.e. opening an outdoor vent or window does not cover one tenth of the floor, it is necessary to install a system of mechanical ventilation and ensure that each person receives at least 17 cubic metres of indoor space gas per hour. There must be an independent ventilation system in the seatroom, kitchen or food room and toilet.
Is it necessary to install oil tanks for the diarrhea?
Yes. The Food Environment Agency's guidelines for the application of licences to food and water reserves stipulate that well-stowed oil tanks must be set up to separate the grease from sewage in order to prevent it from reaching drainage or sewer channels. Food-intensive sewage discharges are also regulated by the Water Pollution Control Ordinance, and operators should apply to the Environmental Protection Agency for a water pollution control license.
What do you need for a certificate when the commercial power works are completed?
According to the Department of Electrical and Electrical Engineering, any electrical work must be carried out by a certified electric contractor; Upon completion of the inspection and test, a certificate of completion (Form WR1) must be signed. If a commercial power device is allowed to carry more than 100 amperes, it must be inspected and tested at least once every five years and obtain a periodic test certificate (Form WR2).
Sze Kit Electrical and Plumbing, can you do all the work on placards?
Sze Kit Electrical and Plumbing is a certified electric engineering contractor responsible for the electrical component, including load assessment, installation of electrical devices and testing. The certification of the ventilation system, fire-fighting devices and gas installations are, as a rule, the responsibility of the relevant registered builder or contractor; We can work with the power.
Summary
The commercial and edible water and electricity projects are supported by three-phase electric power, ventilation to licence plates and are linked to each other. The electricity must be added with the consent of the building, and the certified electric contractor evaluates, works and signs the completion certificate; The ventilation must meet the requirements of 17 cubic metres of room space air per hour for each person in the Environment Agency; There are also well-defined regulations for the discharge of oil reservoirs and sewage. Early assessment, pre-trial review and clarification of who is responsible for the different models are key to a smooth start to business.
Sze Kit Electrical and Plumbing Air-Cooling Pipehouse Maintenance Company is in possession of certified electric power engineering contractors and small-scale works to provide power works and daily water and air maintenance for businesses in Yuen Long, Tin Shui Wai, Tuen Mun and the New Zone, all of which must be paid before work commences. Team background available.About us and Past projects。
This is only general data. The license plate and statutory requirements are based on the latest guidelines for government departments.